Production in the September period totalled 4147 nickel tonnes, impacted by re-sequencing of the Flying Fox mine schedule into lower grade zones (due to seismicity), and lower grades at Spotted
Be everywhere in mining
Dig even deeper with a premium subscription for access to annual reports from the Mining Journal Intelligence department.