The PFS looked at converting the lower portion of the current sub-level cave to a series of block caves.
The study was based on a probable ore reserve of 220Mt at 1.1% copper, 0.
date:12/10/2020
location:Virtual Event
Providing investors with access to the very best mining projects from exploration to production.
date:02/11/2020
location:Virtual Event
Mining Journal Select 365: Mining. Investment. Online.
date:01/01/2021
location:TBC, 2021 – London
Exceptional investment opportunities selected by Mining Journal
Track emerging trends and changes in the mining finance landscape along with investor...
A comprehensive annual review of mining risk, including a jurisdiction-by-jurisdiction...
Discover the most prominent challenges for mining company C-suite executives both...
Discover the methodology behind our development-asset database, along with a sample...
Moho Resources tops crowded field
OZ Minerals says the block cave expansion prefeasibility study for its Carrapateena project in South Australia highlights the potential to unlock a long-life mining province.
The PFS looked at converting the lower portion of the current sub-level cave to a series of block caves.
The study was based on a probable ore reserve of 220Mt at 1.1% copper, 0.
'Pivotal year' ahead for copper-gold producer
OZ adds more growth optionality
First Carrapateena copper for OZ
Byrnecut takes over at Carrapateena
Surge surges on copper results from Ootsa
PolyMet gets ruling in favour of air permit
Galena provides a leading light
Galena provides a leading light