Drilling at three targets at the asset project struck mineralisation including 1,042 g/t silver equivalent over 0.45 metres; 505 g/t over 0.71 metres; and 319 g/t over 0.35 metres.
Be everywhere in mining
Dig even deeper with a premium subscription for access to annual reports from the Mining Journal Intelligence department.