The initial hole was drilled vertically and returned 606m grading 0.32% copper, 0.02% molybdenum and 0.02 grams per tonne gold, or 0.
Be everywhere in mining
Dig even deeper with a premium subscription for access to annual reports from the Mining Journal Intelligence department.