Geotechnical risk in a high-grade section of the Escondida pit has caused BHP to lower the mine's fiscal 2022-2023 (July-June) guidance for the operation to 1050-1080kt, from 1080-1180kt.
Be everywhere in mining
Dig even deeper with a premium subscription for access to annual reports from the Mining Journal Intelligence department.