The standout intersection from the 2,286m phase-two campaign was 13.8m grading 46.7g/t gold from 224m at the Bushiangala deposit, one of two at the project. The other deposit is Isulu.
Be everywhere in mining
Dig even deeper with a premium subscription for access to annual reports from the Mining Journal Intelligence department.