PRECIOUS METALS

Pretium cuts grade with new mine plan

Pretium Resources has announced an updated mineral reserve, resource and life of mine plan for its Brucejack gold mine in British Columbia, Canada.

Staff reporter
Brucejack in British Columbia, Canada

Brucejack in British Columbia, Canada

The updated life-of-mine plan is focused on the exploitation of the Valley of the Kings and West Zone to deliver average annual production of more than 366,000oz during the first five years, and average annual production of over 357,000oz over the first 10 years at an average all-in sustaining cost of $747/oz, and life of mine average of 311,000oz.

The updated Brucejack proven and probable reserve estimate is 15.7 million tonnes grading 8.4 grams of per tonne for 4.2Moz at a lowered cut-off grade of 3.5g/t, which the company said better resembled recently mined grades. This represents a 33% grade reduction from the prior 12.6g/t grade and the loss of some 2.2Moz.

The revised mine plan will generate strong cash flows at a $1,600/oz gold price which the company estimates at $700 million over the next three years - sufficient to cover its $480 million of debt.

"At a gold price of $1,600, Brucejack now has an estimated after-tax net present value at a 5% discount rate of $2.13 billion over the 13-year mine life. Since achieving commercial production in July 2017, Brucejack has generated over $500 million of cash flow and is expected to generate strong cash flow well into the future," said president and CEO Joseph Ovsenek in a statement.

"As a first pass, this appears to be a step towards setting attainable guidance," said BMO Capital Markets analyst Andrew Mikitchook in a research note.

About 50% of the tonnes in the 2020 mineral reserve are from the Valley of the Kings area. A mine call factor was applied to the remaining tonnes, which is a reconciliation factor derived from operational experience. It is determined by applying an upper limit to the reserve stope grade, determined by the average diamond drill hole spacing of the reserve shape. Stopes with higher drill density have a lower resulting mine call factor than stopes with lower drill density.

Pretium is running a search process to find a new president and CEO.

Shares in Pretium Resources are trading at C$10.28, valuing the company at $1.8 billion.

 

A growing series of reports, each focused on a key discussion point for the farming sector, brought to you by the Kondinin team.

A growing series of reports, each focused on a key discussion point for the farming sector, brought to you by the Kondinin team.

editions

Mining Journal Intelligence Investor Sentiment Report 2024

Survey revealing the plans, priorities, and preferences of 120+ mining investors and their expectations for the sector in 2024.

editions

Mining Journal Intelligence Mining Equities Report 2023

Access an exclusive, inside look on the quarterly mining IPOs and secondary raisings data and mining equities performance tables with an annual Stock Exchange Comparisons supplement.

editions

Mining Journal Intelligence World Risk Report 2023 (feat. MineHutte ratings)

A detailed analysis of mining investment risks across 121 jurisdictions globally, built on 11 ‘hard risk’ metrics and an industrywide survey.

editions

Mining Journal Intelligence Global Leadership Report 2023: Social licence

Gain insights into social licence trends and best practices from interviews with 20+ top mining company executives and an industrywide survey.