EXPLORATION & DEVELOPMENT

Wesdome's Kiena resource update a step towards production

Wesdome Gold Mines has updated the high-grade resource at Kiena near Val d’Or, Quebec, to more than 930,000oz.

Staff Reporter
Wesdome Gold Mines has released an updated mineral resource estimate for its Kiena brownfields project in Quebec, Canada

Wesdome Gold Mines has released an updated mineral resource estimate for its Kiena brownfields project in Quebec, Canada

While the indicated and inferred resource increased to 933,300oz gold, from 847,500oz reported in 2019, the indicated portion rose 77% from 450,400oz to 762,500oz, reflecting an extensive amount of infill drilling completed since the last resource estimate.

Notably, the grade of the updated resource remained high at 13 grams per tonne.

The main component of the updated resource is the newly discovered Deep A zones where the tenor of mineralisation is said to be "very good" at circa 16.3g/t, and the total resource size is 840,400oz.

The Deep A Zones remains open to depth.

The updated resource is expected to underpin a pre-feasibility study due by June next year, at which time a formal production decision is anticipated.

However, the mill at Kiena has been restarted and is expected to process about 6,000t of development ore by year-end to help verify metallurgy.

Laurentian Bank Securities expects the Kiena mill to process ore intermittently as underground development is completed, ahead of a formal production decision.

The past-producing Kiena mine is fully permitted and has existing mining and milling infrastructure, including a 930m production shaft and a 2,000t/d mill.

From 1981 to 2013, the mine produced 1.75Moz gold from 12.5Mt ore at a head grade of 4.5g/t gold. The bulk of this production came from the S-50 Zone between depths of 100m-1,000m. Operations were suspended in 2013.

A March preliminary economic assessment outlined, on an after-tax basis, a net present value at 5% discount of C$416.1 million and an internal rate of return of 102%. The $34.8 million project has a capex payback period of 1.7 years.

The project can add about 86,000ozpa to Wesdome's current 200,000oz-plus production from its Eagle River Complex in Wawa, Ontario.

Wesdome shares (TSX:WDO) last traded at $10.71 in Toronto, capitalising the company at $1.5 billion.

 

A growing series of reports, each focused on a key discussion point for the farming sector, brought to you by the Kondinin team.

A growing series of reports, each focused on a key discussion point for the farming sector, brought to you by the Kondinin team.

editions

Mining Journal Intelligence Investor Sentiment Report 2024

Survey revealing the plans, priorities, and preferences of 120+ mining investors and their expectations for the sector in 2024.

editions

Mining Journal Intelligence Mining Equities Report 2023

Access an exclusive, inside look on the quarterly mining IPOs and secondary raisings data and mining equities performance tables with an annual Stock Exchange Comparisons supplement.

editions

Mining Journal Intelligence World Risk Report 2023 (feat. MineHutte ratings)

A detailed analysis of mining investment risks across 121 jurisdictions globally, built on 11 ‘hard risk’ metrics and an industrywide survey.

editions

Mining Journal Intelligence Global Leadership Report 2023: Social licence

Gain insights into social licence trends and best practices from interviews with 20+ top mining company executives and an industrywide survey.