-
SOLUTIONS
Mike Dunbar , Managing Director, Mamba Exploration Limited
Mamba Exploration hits high-grade gold at Calyerup Creek
Mamba Exploration is a Western Australian Focused Gold, Nickel and Copper Explorer with four key projects.
Primarily the Darling Range Project which has a nickel, copper & PGE focus. Mamba also holds the Calyerup Creek project that is gold-based as well as their other primary gold project Ashburton.
Mambas final project is the Kimberly (Speewah East, Copper Flats and Ruby Plains) project, with a versatile focus on nickel, copper, cobalt, silver & gold.
Multiple zones of disseminated sulphide mineralisation identified, samples submitted for analysis
Modelling has identified a number of targets, including a late-stage intrusive feature
Drilling has been planned on two conductors with mobilisation scheduled for the 19th of January 2023
Final assay results from the initial RC drilling have demonstrated significant mineralisation
Soil sampling programme has been completed with 2,600 sites sampled
Initial drilling on eastern gravity anomaly intersected significant clay hosted TREO mineralisation
Significant widths of mineralisation in 20 of the initial 22 holes completed at Hyden REE project
Significant mineralisation in 13 of 14 holes and extends for over 350m east-to-west
Conductors coincident with basin growth faults and high-grade copper and silver surface sampling
The project is approximately 30km northeast of the Julimar deposit discovered by Chalice Mining
At least eight distinct anomalies within the Company's Ashburton / Gascoyne Project tenements found
Extremely high-grade clay total rare earth oxide (TREO) drill sample of 46,716 ppm
A 58 hole shallow aircore / RC drill programme has been completed
Auger sampling identified a gold anomaly measuring approximately 300m by 200m
Rare Earth element (REE) & gold project in the East Kimberley secured upon option agreement.
Agreement reached for a 6-month extension, allowing additional time for further investigation
Detailed gravity survey has commenced over the regional gravity anomaly
A Western Australian Focused Gold, Nickel and Copper Explorer Presentation November 2021
Initial drilling completed at Calyerup Creek Project. 56 shallow RC holes drilled
The second diamond drill hole has intersected two zones of sulphide mineralisation
Program plans to double the strike length of the Southern Prospect discovery from 500m to 1,000m
The survey covers four priority Copper and Sliver target areas
Final assay results from RC drilling at Calyerup Creek have identified significant mineralisation
The significant intersections indicate an average of 21% NdPr and 17% HREO from the 22 holes drilled
In total, 50 holes are planned at Calyerup Creek, An additional PoW has been submitted to DMIRS
The first diamond drill hole in the southernmost EM conductor at the Black Hills Project
Downhole EM surveys identify off hole conductors from the 2 initial drill holes completed late 2021
Level 2, 25 Richardson Ave
West Perth WA 6005
To access this document please complete the form below. The document will then open in a new tab. You only need to complete this form once on this website to access any asset posted by any ResourceStocks company.
The download or link you requested has now opened in a new tab. Visit the ResourceStocks homepage to explore more companies and their downloadable information.