Mamba Exploration Limited

"Mamba Exploration Limited, together with its subsidiaries, operates as an early-stage exploration and development company in Australia"

Mike Dunbar , Managing Director, Mamba Exploration Limited

Video Highlight

Mamba Exploration hits high-grade gold at Calyerup Creek

Overview

Mamba Exploration is a Western Australian Focused Gold, Nickel and Copper Explorer

Mamba Exploration is a Western Australian Focused Gold, Nickel and Copper Explorer with four key projects.

Primarily the Darling Range Project which has a nickel, copper & PGE focus. Mamba also holds the Calyerup Creek project that is gold-based as well as their other primary gold project Ashburton.

Mambas final project is the Kimberly (Speewah East, Copper Flats and Ruby Plains) project, with a versatile focus on nickel, copper, cobalt, silver & gold.

 

Exclusive ResourceStocks Assets

Multiple zones of disseminated sulphide mineralisation identified, samples submitted for analysis

Modelling has identified a number of targets, including a late-stage intrusive feature

Drilling has been planned on two conductors with mobilisation scheduled for the 19th of January 2023

Final assay results from the initial RC drilling have demonstrated significant mineralisation

Soil sampling programme has been completed with 2,600 sites sampled

Initial drilling on eastern gravity anomaly intersected significant clay hosted TREO mineralisation

Significant widths of mineralisation in 20 of the initial 22 holes completed at Hyden REE project

Significant mineralisation in 13 of 14 holes and extends for over 350m east-to-west

Conductors coincident with basin growth faults and high-grade copper and silver surface sampling

The project is approximately 30km northeast of the Julimar deposit discovered by Chalice Mining

At least eight distinct anomalies within the Company's Ashburton / Gascoyne Project tenements found

Extremely high-grade clay total rare earth oxide (TREO) drill sample of 46,716 ppm

A 58 hole shallow aircore / RC drill programme has been completed

Auger sampling identified a gold anomaly measuring approximately 300m by 200m

Rare Earth element (REE) & gold project in the East Kimberley secured upon option agreement.

Agreement reached for a 6-month extension, allowing additional time for further investigation

Detailed gravity survey has commenced over the regional gravity anomaly

A Western Australian Focused Gold, Nickel and Copper Explorer Presentation November 2021

Initial drilling completed at Calyerup Creek Project. 56 shallow RC holes drilled

The second diamond drill hole has intersected two zones of sulphide mineralisation

Program plans to double the strike length of the Southern Prospect discovery from 500m to 1,000m

The survey covers four priority Copper and Sliver target areas

Final assay results from RC drilling at Calyerup Creek have identified significant mineralisation

The significant intersections indicate an average of 21% NdPr and 17% HREO from the 22 holes drilled

In total, 50 holes are planned at Calyerup Creek, An additional PoW has been submitted to DMIRS

The first diamond drill hole in the southernmost EM conductor at the Black Hills Project

Downhole EM surveys identify off hole conductors from the 2 initial drill holes completed late 2021

Stock Price

 

Company Financials

 

Offices

Level 2, 25 Richardson Ave
West Perth WA 6005