upcoming mining journal research

Add new layer of intelligence to your investment decisions Publication of the Mining Journal World Risk Report (feat.MineHutte ratings) is the culmination...

EYEBROW

29 September 2017
Test edition
Test edition

Summary of this Test edition

EYEBROW

26 September 2017

upcoming mining journal jobs

Jury out on Cascabel resource

Not all agree, but there is plenty of support for SolGold's first pass numbers

TMAC appoints banker as CEO

BMO mining chief to take on mining company with operational issues

Dumont back as nickel-cobalt opportunity

Quebec nickel-cobalt project taking calls from interested parties

Kingsgate board survives coup

A 55% majority of shareholders backed the Kingsgate chairman

upcoming mining journal events

SEG 2017 Conference, Ore Deposits of Asia: China and Beyond

Detailed Event Info: The Organizing Committee is pleased to invite you to the SEG 2017 Conference, Ore Deposits of Asia:...

Partner Content

Doe Run Peru's Productive Units are on the Public Auction Block

This public auction entials two productive units: Cobriza Mine and La Oroya Metallurgical Complex.

Partner Content

Doe Run Peru's Productive Units are on the Public Auction Block

This public auction entials two productive units: Cobriza Mine and La Oroya Metallurgical Complex.

Doe Run Peru's Productive Units are on the Public Auction Block

This public auction by Doe Run Peru entails two productive units: Cobriza Mine and La Oroya Metallurgical Complex.

Cobriza Mine is an underground, highly mechanized copper mine located southeast of Lima in the eastern range of the Peruvian Andes. Cobriza currently processes 4,300 tons per day of ore but has the potential to generate approximately 9,100 tons at full capacity. Work on the mine's concession areas, which cover 51,896 hectares, is expected to significantly boost reserve horizons.

 

La Oroya Metallurgical Complex is a uniquely flexible, integrated, polymetallic metallurgical facility in the central Andes that produces 17 high-quality products. The complex is comprised of four circuits: lead, zinc, copper and precious metals. This facility was specifically designed to handle ores from the region and is strategically located to benefit from on-going growth in Peruvian mining.

The productive units will be offered SEPARATELY on DIFFERENT dates in March/April 2018. If a unit is sold, subsequent auction dates will be eliminated. The schedule is as follows:

alt=''

 For more information, please contact:

Oscar Zapata
Asset Sale Direction
ozapata@dirige.com.pe

Kathleen Gallagher
Investor Relations
gall.kathleen@gmail.com

 

topics

loader

Doe run peru

category-img

AT A GLANCE

Peru Office: 

  • Av. Camino Real 456 - Torre Real - Floor 13 - Office 1303; San Isidro, Lima
  • Phone: +61 8 9423 900
  • Fax: +51 2151200
  • Email: ozapata@dirige.com.pe
  • Web: http://www.doerun.com.pe/

doe run peru

sponsor

AT A GLANCE

Peru Office: 

  • Av. Camino Real 456 - Torre Real - Floor 13 - Office 1303; San Isidro, Lima
  • Phone: +61 8 9423 900
  • Fax: +51 2151200
  • Email: ozapata@dirige.com.pe
  • Web: http://www.doerun.com.pe/